Main page /
MANAGEMENT SYSTEM /
Production Activity Management
Previous page
Next page
Add to favorite
Cooperation
Synergy
Synergy
- Multi-D Technology for Optimization of Construction and Mounting Operations
- Introduction of Production System Rosatom (PSR)
- Construction Cost Management Method
Within the frames of production activity management the Company makes its mission to reduce duration and cost of construction. In order to solve these tasks the Integrated Company executes a number of projects:
- Elaboration and introduction of the Multi-D technology for optimization of construction and mounting operations;
- Introduction of Production System Rosatom (PSR);
- Improvement and introduction of construction cost management method;
- Optimization of procurement procedures.
In 2012 elaboration, setup and trial operation of the NPP construction management system based on the Multi-D technology was completed within the VVER-TOI project. This technology provides for management of designing and construction on the basis of an information model (Multi-D model) of the facility.